Challenge: The operator of a new project was experiencing leakage from newly installed special alloy tubing and fittings when pressure testing prior to commissioning the plant
Approach: AFS Technologies proposed a full test program using different installation techniques and analysis of the components in each assembly. This program consisted of over 150 individual tests included testing materials to destruction and rear ferrule grip
Result: AFS Technologies provided a bespoke installation process, later adopted by the fitting manufacturer for this specific material. This allowed the operator to ensure it's contractor installed leak-free connections